Over 20 years die casting machine manufacturers

China Hot chamber die casting machine sales champion

China famous die casting machine manufacturers

Products

  • Paint Ink Production Line
  • Paint Ink Production Line
  • Paint Ink Production Line

Paint Ink Production Line

Brand :CAREER

Product origin :China

Delivery time :20 days after receiving down payment

Supply capacity :10 lines /month

this paint line can independently accomplish the vacuum feeding, dispersion, grinding, filtering and semi-automatic filling the entire industrial process.

Water-based Paint Factory Production Line
Product Description                                                                                                            
1.This product is suitable for industrial mass production of complete sets of equipment.
2. The equipment can independently accomplish the vacuum feeding, dispersion, grinding, filtering and semi-automatic filling the entire industrial process.
3. Design of products can be customized according to the scale of production, realize the automation process control the equipment, saving space and staff, convenient management.

Product Show                                                                                                                      

 

farfly1.jpg


Features                                                                                                                               

1) It applies to small, middle, large scale production, output from 1000-50,000 ton one year
2) The material which contact with the product is stainles steel, ss304 or 316L
3) The vessel is mirror plolished outside and inside, which make the vessle easy to clean and will
not have residual, with different thickness for different volume.
4) Configuration: according to different output and the particle size you need, we will equip with
high speed disperser, Bead Mill and paint color agitator, filter and automatic filling machine.
5) Installation: Our professional technician will come to your factory to instal the whole system.
6) Debug: After installation, we in charge of debug.
7) Training: Our engineer will train your workman about the operation and attention matters.
8) Maintenance: We have a strong service term, our engineer will solve your problem as earlier as possible

 

Main Process                                                                                                                 

 

1). put the material to the 5000L reactor kettle,start heating ,when the temperature reach about 100 degrees,it will produc gases,and the gas will into the separation column.

2). after part be cooled by the separation column, the rest gas into horizontal condenser,then condenser will cooling the gas ,after all the water and gas will into the catchment device.

3). the catchment device,will separate material back to reactor kettle,and exclude the water.(the process may be last about fifteen to twenty hours)

4). during the reaction process,in order to improve the speed, can extracting vacuum,when reach the suitable time, sampling, assay viscosity,if meet the requiment, then cooling.

5). when the temperature reach 130 degrees,put the raw materials to dilute kettle,and add Xylene (this kind of material) to dilute kettle

 

 Nano Laboratory                                                                                                                 

 

lab1.jpglab2.jpglab3.jpglab4.jpg
 

Workshop                                                                                                                            

 

factory1.png
factory2.png

 

Customer Site                                                                                                                      
FXXX6.png
root4.jpg
 

Packaging & Delivery                                                                                                         

 

pack4.jpg

pack3.jpg

 
Why choose us?                                                                                                                      

Equipment for paint making Features:

1. Sealessness , eco-friendly
2. Highly Automatic, Easy operation;
3. Efficient and energy saving
4. Wide range of application: acrylic emulsion, primers, top finish painting, elastic flat paint, water proof coating, wall painting inner and outter ,interior and exterior, high, medium and low end, etc

5. Annual production up to 2000~300 tons;
6. Painting fineness reaches 15mm or less
7. Mirror surface polishing for all stainless steel parts makes them delightful and shining, vacuum operation

 
Noto:
The set includes 9 sub-systems: 
1) Vacuum material adding system,
2) Pressure discharging and filtration system,
3) Slurry producing system,
4) Painting mixing system,
5) Cooling system,
6) Piping system,
7) Electrical control system,
8) Operation platform;
9) Packaging system
 Lab Appointment                                                                                                                 

Lab Experiment Equipments: disperser(1.1kw), lab sand mill, ceramic sand mill, laser granulometer

Experiment Process: 

1) Material information 

2) Experiment preparation 

3) Experiment mode confirm

4)  Experiment execute

5)  Report Generate

6)  Sending test products to clients

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Email :
Company :
  • Name :

  • Phone :

Message :

Privacy policy

close left right